Tlokwe Anc Parliamentary Constituency Office 402

Tlokwe Anc Parliamentary Constituency Office 402 "Taking Parliament to the People"

27/01/2026

PCO 402 Tlokwe | Deployee Profile
Cde Barbara Dallas Creecy is a committed cadre of the African National Congress (ANC), rooted in the traditions of the liberation struggle and service to the people.
She joined the ANC in 1979 and was active in the United Democratic Front (UDF) during the struggle against apartheid.
Post-1994, she served in the Gauteng Provincial Legislature, where she was deployed as MEC for Sports, Recreation, Arts and Culture; Education; and Finance, contributing to access to education, social cohesion, and sound governance.
Cde Creecy later served as Minister of Environment, Forestry and Fisheries and is currently deployed as Minister of Transport, focusing on road safety, rail revitalisation, and improving public transport.
She is a member of the ANC NEC and NWC and a deployee of PCO 402 Tlokwe.
The political office is managed by Cde Katleho Kortjaas Kortjaas.
Unity β€’ Service β€’ Accountability

Locate the office of Comrade Barbara Creecy
08/10/2025

Locate the office of Comrade Barbara Creecy

18/07/2025
18/07/2025

MEC decided to extend, his 67 minutes to 10 hours enjoying with, kids with special needs.

18/07/2025
🚧 JB MARKS SERVICE DELIVERY UPDATE 🚧  24 June 2025 | Community Progress Report πŸ›£οΈ JB Marks Road Maintenance & Paving Pro...
10/07/2025

🚧 JB MARKS SERVICE DELIVERY UPDATE 🚧
24 June 2025 | Community Progress Report

πŸ›£οΈ JB Marks Road Maintenance & Paving Progress

1. Bloemetjie Street
- οΏ½ Pothole patching 97% complete (4 remaining squared holes β†’ πŸ•’ asphalt tomorrow).
2. Luke Street & Rietief Intersection
- βœ… 20% of holes squared/stabilized (crusher sand) β†’ 🚧 asphalt tomorrow.
- πŸ”„ Scope extended: Shopping complex entrance at Luke & Toit prepped (80% done β†’ πŸ•› asphalt after lunch). Remaining 20% = 🎯 morning priority.
3. Chief Albert Luthuli & Louis Le Grange Intersection
- πŸ—οΈ Paving at 65% β†’ continuing tomorrow.

πŸš› JB Marks Yellow Fleet Team
- πŸ“ Mosidi Street (Nanogang Primary School):
- πŸ”§ Digging new sewer pipeline + 🚿 cleaning channels.
πŸ’§ JB Marks Water Service Repairs
(βœ”οΈ All repairs completed)
1. 2805 Phiri Str: πŸ”© Pipe & tee piece repaired.
2. 2681 Tlhalerwa Str: πŸ”§ Pipe repaired (x2).
3. 20447 Mogotsi Str: βš™οΈ Tee piece fixed.
4. 7 Gate View: 🚰 Mainline pipe restored.
5. 1866 Makgoa Str: πŸ“ New meter + pipe installed.
6. 15471 Ext 11: πŸ”„ Meter replaced.

🚽 JB Marks Sewage Spillage Resolved
(🚨 All cases attended)
1. 5264 Thusanang
2. 1422 Bathoeng
3. 268 Kgama
4. 20250 Extension 9
5. 2175 Bathoeng

πŸ—‘οΈ JB Marks Waste Management
- πŸ—“οΈ 100% collection: 🏠 Households | 🏒 Businesses | πŸ”₯ Hotspots.
- 🚯 Illegal Dumping Clearance:
- πŸ“š Ikageng Library (Bathoeng Street).
- 🏘️ Hlubi Street.

🌊 JB Marks Comprehensive Reservoir Analysis (2025-06-24 @ 09:10 AM)

Vyfhoek System
1️⃣ Old Works Reservoir
- Current Level: 89.29% (Excellent Capacity)
- Status: βœ… Operating normally with stable output pressure
- Last Maintenance: 2025-06-15 (Next inspection due 2025-07-10)
- Supply Impact: Feeds 3,200 households in central business district

2️⃣ Vyfhoek 6.4ML Reservoir
- Current Level: 85.71% (Healthy)
- Status: βœ… Normal operations with automatic refill activated
- Special Note: Recently upgraded pressure valves (2025-05-22)
- Supply Impact: Critical for industrial zone water supply

3️⃣ Vyfhoek 3.4ML Reservoirs (Twin Tanks)
- Status: πŸ”„ ISOLATED for planned maintenance
- Maintenance Details:
- Tank A: Valve replacement and interior lining inspection
- Tank B: Structural integrity testing
- Contingency: Temporary bypass to Old Works reservoir active
- Expected Return: 2025-06-26 (48-hour outage)

Ventersdorp System
4️⃣ Ventersdorp 9.5ML Reservoir
- Current Level: 71.43% (Caution Zone)
- Status: ⚠️ Below optimal threshold (80% target)
- Refill Strategy: Night pumping from Vaal River source activated
- Consumption Rate: Dropping 2.1% per day (summer usage pattern)

5️⃣ Ventersdorp 13.5ML Reservoir
- Current Level: 67.86% (Concerning)
- Status: ⚠️ Triggered low-level alert at 3:00 AM today
- Emergency Measures:
- Reduced supply pressure to extend reserves
- Tanker backup scheduled for high-demand areas

6️⃣ Ventersdorp 15ML Reservoir
- Current Level: 60.71% (Critical)
- Status: ❗ EMERGENCY RESPONSE ACTIVATED
- Root Cause: Pump station #4 failure at Rietfontein feeder
- Action Plan:
1. Emergency repair team dispatched (ETA 11:00 AM)
2. 6 water tankers deployed to schools/hospitals
3. SMS alerts sent to 8,742 registered users

Ikageng System
7️⃣ Ikageng Main Reservoir
- Current Level: 77.27% (Adequate)
- Status: βœ… Normal operations with 14psi output pressure
- Special Feature: New smart metering system installed 2025-06-10

8️⃣ Ikageng West Reservoir
- Current Level: 95.45% (Peak Capacity)
- Status: 🌊 OPTIMAL with 2% buffer margin
- Distribution: Feeding 12 new RDP housing developments

Eesterandjies Emergency Situation
9️⃣ Eesterandjies 5ML Reservoir
- Status: 🚨 COMPLETELY EMPTY (Red Alert)
- Crisis Timeline:
- 06:00 AM: Level dropped below 10% threshold
- 07:30 AM: Automatic isolation to prevent pump damage
- Impact: 4,850 residents affected
- Response:
- 12 emergency water tankers deployed
- Temporary pipeline from Ikageng West under construction

πŸ”Ÿ Eesterandjies 10ML Reservoir
- Status: πŸ”„ ISOLATED for emergency repairs
- Fault: Major leak detected at northern junction
- Repair Team: 8 technicians on site with specialized equipment
- Estimated Restoration: 2025-06-25 @ 18:00


πŸ“£ Stay Connected:
πŸ“ž Report Issues: 018 293 1111
βœ‰οΈ Email: [email protected]🌐 Follow JB Marks Official Page

🚨 JB MARKS SERVICE DELIVERY ALERT 🚨  πŸ“… Last Updated: 09 July 2025 | 19:55 PM    πŸ›£οΈ ROAD REPAIRS PROGRESS  πŸ“ Bathoeng 1 (...
10/07/2025

🚨 JB MARKS SERVICE DELIVERY ALERT 🚨
πŸ“… Last Updated: 09 July 2025 | 19:55 PM

πŸ›£οΈ ROAD REPAIRS PROGRESS
πŸ“ Bathoeng 1 (Ward 14)
βœ… 75% Pothole-Free Status Achieved
β€’ 5% New Potholes Squared & Prepped
β€’ πŸš› Tomorrow's Plan:
- Team A: Prep more potholes ahead
- Team B: Asphalt filling (hot-mix)

πŸŽ‰ PAVING COMPLETION
πŸ“ Mbobi Street (Ward 14)
πŸ’― 100% Complete!
β€’ Final Site Cleanup Underway
β€’ Road Officially will be Open for Traffic tomorrow.

⚑JB MARKS ELECTRIFICATION PROJECT UPDATE ⚑
πŸ“ Ward 17 - Extension 4 (260 Households)

πŸ“Œ PROJECT STATUS: SITE ESTABLISHMENT
βœ… Milestone Achieved (09 July 2025):
- Site cleared and secured
- Contractor compound set up
- Material delivery underway
πŸ”§ CURRENT ACTIVITIES
1. Infrastructure Prep:
- Trenching for underground cables
- Pole planting along boundary lines

2. Safety Measures:
- Danger signage installed
- Community safety briefings conducted

3. Material Logistics:
- 85% of poles delivered
- Transformers being positioned

⏳ NEXT STEPS
- This Week: Complete foundation work for substation
- Next Week: Begin overhead line installation
- Target Completion:31 August 2025

🚽 SEWAGE SPILLAGE RESOLVED
βœ… Blockages Cleared:
1. 2175 Bathoeng (Ward 16) - Roddle eye unblocked
2. Mafoko St (4708, Ward 10)
3. Sounder Water (18595, Ward 9)
4. Ext 9 (20251, Ward 12)

🌊 WARD 11 SEWER PIPELINE PROJECT
βœ… Phase 1 Completed!
β€’ First section fully installed and operational
β€’ Team now mobilizing to opposite side for Phase 2

⚠️ Upcoming Impacts (Phase 2):
β€’ Traffic slowdowns due to excavation
β€’ Temporary road closures (signage will be posted)

πŸ“’ Community Briefing:
β€’ Ward Councillor to host public meeting
β€’ Purpose: Explain Phase 2 timeline and alternative routes

♻️ WASTE MANAGEMENT
πŸ—‘οΈ 100% Collection Rate:
β€’ Household Bins βœ…
β€’ Businesses βœ…
β€’ Hotspots βœ…

🧹 Illegal Dumping Cleared:
1. Ikageng Library (Bathoeng St)
2. Cnr Moraladi & Bathoeng

🌿 PARKS MAINTENANCE
βœ‚οΈ Roadside Grass Cutting:
β€’ Ikageng Weg (Near Kingfood) - 100% Done

πŸ’§ DETAILED RESERVOIR ANALYSIS & IMPACT

1️⃣ OLD WORKS RESERVOIR (90.91% - EXCELLENT)
πŸ“ Supply Areas:
- Potchefstroom CBD
- Extensions 1-3
- Mohadin Industrial Area
- Government buildings (Municipal offices, courts)

πŸ“ˆ Status:
- Significant improvement (from 77.27% on 6 July)
- Optimal pressure maintained across all zones

2️⃣ VYFHOEK SYSTEM
πŸ”Ή 6.4ML Tank (100% βœ… FULL CAPACITY)
πŸ“ Supplies:
- Vyfhoek Township
- Promosa residential area
- Extension 11 (partial)
⚠️ Note:
- 3.4ML tanks remain isolated for 315 pipeline construction
- Reduced system redundancy but no current supply risk

-3️⃣ VENTERSDORP COMPLEX (STABLE)
πŸ”Έ 9.5ML (71.43% βœ…)
- Recovery: Improved from 60.71% (6 July)
πŸ”Έ 13.5ML (67.86% ⚠️ MONITOR)
- Supplies: Dassierand, SANDF
- Action: Valve adjustments to balance with 9.5ML
πŸ”Έ 15ML (60.91% ⚠️ LOW)
- Supplies: High-lying areas (hospital zone)
- 🚨 Contingency: Night pumping from Ikageng West

4️⃣ IKAGENG SYSTEM (OPTIMAL)
πŸ”Ή Main Reservoir (86.36% βœ…)
- Supplies: Ikageng Central, schools, clinics
πŸ”Ή West Reservoir (100% βœ…)
- Supplies: Extensions 4, 8, 9
- Critical Role: Backing up Old Works & Ventersdorp

5️⃣ EESTERANDJIES (EMERGENCY SITUATION)
πŸ”΄ 5ML Tank (EMPTY)
- Affected Areas:
- Extension 10 (full outage)
- High-altitude farms
- πŸš› Tanker Deployment:
- 4 tankers rotating (06:00-18:00)
- Priority: Clinic & schools

🚧 10ML Tank (ISOLATED)
- Reason: Valve replacement
- ETA: 24 hours (until 10 July AM)

πŸ”§ ENGINEERING ACTIONS
1. Eesterandjies:
- Diagnose 5ML refill failure (pump inspection)
- Expedite 10ML valve repair
2. Ventersdorp:
- Optimize 15ML replenishment
- Audit hospital zone pipes
3. Vyfhoek: Monitor 6.4ML usage during isolation

Key Notes:
β€’ 🚧 Bathoeng drivers: Expect lane shifts tomorrow
β€’ 🎊 Mbobi Street will fully be operational tomorrow.
β€’ πŸ’§ Sewer teams responded to 5 critical cases
β€’ 🚽Ward 11: Expect sewer team visibility & traffic delays

πŸ“ž Report Issues:
- Water/Sewage 018 299 5111
- Roads/Paving: 018 293 1111
- Disaster : 018 299 53

πŸ“’ | Next update: 10 July 2025 @ 19: 55 PM

πŸš› Teams on ground until sunset

Address

6481 Lekhele Street, Ikageng Township
Potchefstroom
2531

Opening Hours

Monday 07:45 - 16:45
Tuesday 07:45 - 16:45
Wednesday 07:45 - 16:45
Thursday 07:45 - 16:45
Friday 07:45 - 16:45

Website

Alerts

Be the first to know and let us send you an email when Tlokwe Anc Parliamentary Constituency Office 402 posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share