09/14/2026
9/14 Downtown Project Schedule & Updates
Roads and Sidewalks – The road extending from the Ferry Terminal to Windy Way will be reclaimed on Wednesday and Thursday of this week–September 16 & 17. Mobilization will take place TOMORROW (September 15) not today as previously stated.
There will be NO PARKING ON MAIN STREET from the ferry terminal to Windy Way on Wednesday and Thursday.
There will be parking available at the Net Factory Site and in the Downtown and Commercial Lots.
There will be single-lane traffic on Main Street during construction.
The reclamation process involves grinding up the existing pavement and spreading reclaimed material back onto the roadway. Be prepared for increased truck traffic and dust along Main Street. Plan on extra travel time and avoid unnecessary travel on the roadway.
The final layer of pavement and sidewalk construction will take place next spring. JBI anticipates shutting down construction for the winter by mid-November and resuming work in the spring.
Stormwater – Today, JBI will be continuing to work in front of FIEC/Salt/ the Sand Bar, and Windhorse Arts/New Era Gallery. There will be single lane traffic around the construction site. Please be mindful of traffic control and drive slowly over crosscuts and through the construction zone.
In addition, all along the Main Street corridor, the crew will be working to prepare drain manhole covers and other water/stormwater components for the road reclamation process. Please be mindful of crew working in the roadway today and tomorrow.
For Downtown Project Info, Updates, and Schedule go to https://www.townofvinalhaven.org/1276/Downtown-Project