Mt Vernon Project

Mt Vernon Project Join us as we take this journey from Tallassee’s biggest eyesore to something beautiful.

03/12/2024

Two gates have been down for a few days. The beauty just never gets old.

01/07/2024

Main floor retail shops. There will be 18 large shops and at least 6 small with a hallway straight down the middle.

It’s been way to wet for equipment to run this week but there is always something going on in someaspect of the project....
08/17/2023

It’s been way to wet for equipment to run this week but there is always something going on in some
aspect of the project. I’m sure some of our followers can tell is what was stored in these silos.

08/12/2023

Hey y’all! Here’s a short video of what will be the future retail shops. Can’t wait for the rebuild to start so we can share our vision!

08/02/2023

Happy Wednesday! Here is a short video of what’s going on that you can’t see from the road or bridge. Cleaning up the inside of the main building.

Who likes now and then pics? 🙌🙌 The first pic was taken yesterday. The second, back in October 🤩
08/01/2023

Who likes now and then pics? 🙌🙌 The first pic was taken yesterday. The second, back in October 🤩

Little bit warm lately but we are still tearing things up and small sections are coming down 😊
07/24/2023

Little bit warm lately but we are still tearing things up and small sections are coming down 😊

07/12/2023

With bridge work and the fact the crew is currently working on the south side of the property, most of y’all probably haven’t noticed much being done. Demo continues on the concrete slab where the Recreation Center will be.

Happy Sunday 😊 Took the dogs for a walk today and grabbed some pics of what was done Thursday and Friday.  Knocked the b...
06/25/2023

Happy Sunday 😊 Took the dogs for a walk today and grabbed some pics of what was done Thursday and Friday. Knocked the bricks out of the main building walls. These openings will be all glass when the time comes to rebuild.

Good evening. I was asked to do a then and now. I didn’t get the exact position but took two of what is now.  First pic ...
06/22/2023

Good evening. I was asked to do a then and now. I didn’t get the exact position but took two of what is now. First pic is from Oct 10, 2022, the second and third pics are today.

06/21/2023

With so much rain, we’ve had to dodge storms,. Even still, work continues on the east side of the main building.