The Sellwood Bridge Reconstruction

The Sellwood Bridge Reconstruction The Sellwood Bridge is being replaced. First, the construction of the temporary bridge. Construction of the new Sellwood Bridge began in December of 2011.

The first step is to construct a temporary bridge, to enable the flow of traffic while the replacement is being built.

Beautiful painting!
12/14/2022

Beautiful painting!

07/07/2022
Another day at the Sellwood Bridge
10/05/2021

Another day at the Sellwood Bridge

Sellwood Bridge at night
08/22/2019

Sellwood Bridge at night

Stern-wheeler on a rainy Saturday
12/03/2017

Stern-wheeler on a rainy Saturday

It's snowing!!
01/11/2017

It's snowing!!

The New Bridge
12/07/2016

The New Bridge

04/02/2016
03/17/2016

The work continues into the evening

03/15/2016

Deconstructing the Old Bridge

03/10/2016
03/10/2016

The Cement Eaters have landed, and they're eating the remnants of the old bridge on the East Side.