06/16/2026
Plainfield already has one EPA Superfund groundwater contamination site. PFAS was still being detected there in 2020.
Gallup's Quarry on Tarbox Road. 29 acres of illegal industrial waste dumping in the 1970s. EPA put it on the National Priorities List in 1989. The federal cleanup plan is "monitored natural attenuation" — which means there is no cleanup. The contamination just sits there. A biomass gasification plant already operates on top of that site.
Now SMART Technology Systems wants to build a SECOND gasification plant — a 1,800-ton-a-day waste-to-energy facility — on 81 acres off Route 12, in a residential neighborhood, in the same town.
One Superfund site is enough.
Email the Connecticut Siting Council and oppose the SMART trash plant: https://portal.ct.gov/csc