09/10/2026
Design Public Hearing (DPH) - 616433 Palmer
Wednesday, September 30, 2026 at 6:00 pm
Use this link for more information or to register to access the meeting; https://www.mass.gov/event/palmer-roadway-and-bridge-superstructure-replacements-along-i-90-and-a-bridge-over-i-90-09-30-2026
Superstructure Replacement, P-01-052 (4MD/4ME) & P-01-055 (4M9/4MA), I-90
(EB/WB) over ST 32/Thorndike Street & ST 67/Boston Road and Bridge Replacement, P-01-054 (4MB), Flynt Street over I-90 (Design-Build)
What is happening?
The Massachusetts Department of Transportation – Highway Division (MassDOT) will be holding a virtual Design Public Hearing regarding MassDOT Project No. 616433 in Palmer.
This meeting will discuss the replacement of the Interstate 90 (I-90 / Massachusetts Turnpike) bridge superstructures over Thorndike Street (Route 32) and Boston Road (Route 67), as well as the reconstruction of the Flynt Street bridge over I-90. This project will include roadway reconstruction, pavement milling and overlay, drainage improvements, traffic management that includes temporary highway lane crossovers, temporary precast movable ("zipper") barriers, pavement markings and signage, and overhead and underground utility relocations.
How will this affect you?
The reconstruction of these bridges is anticipated to be completed on one side of I-90 at a time. Accelerated bridge demolition, construction, and temporary traffic crossovers will occur during weekends only. The proposed project will also include a detour for the Flynt Street bridge replacement and limited weekend detours to Thorndike Street and Boston Road.
-----------------------------------------------------------------
To ensure its meetings are accessible, MassDOT reasonably provides: translation, interpretation, modifications, accommodations, alternative formats, and auxiliary aids and services. To request such services, please contact MassDOT’s Chief Diversity and Civil Rights Officer at 857-368-8580 or [email protected]. For adequate time to process such request, please make them as early as possible, ideally 10 days prior to the event.
Project inquiries may also be emailed to [email protected]. Please submit any written statements regarding the proposed undertaking to: Carrie A. Lavallee, P.E., Chief Engineer, MassDOT, 10 Park Plaza, Boston, MA 02116, Attention: Major Projects, PROJECT FILE NO. 616433