06/09/2026
7th Avenue and Main Street Utility & Street Reconstruction Project
The City of Milbank will soon begin the 7th Avenue and Main Street Utility and Street Reconstruction Project. This project is designed to improve aging infrastructure, address drainage concerns, enhance accessibility, and provide a safer and more reliable street system for residents.
Construction is expected to begin in June or July 2026, starting with tree removals. Major utility and street improvements are anticipated to be completed by October 2026. The first layer of asphalt will be installed in the fall of 2026, with the final asphalt lift scheduled for spring 2027.
Improvements include:
βοΈ Replacement of aging sanitary sewer infrastructure.
βοΈ Installation of new water mains, hydrants, valves, and water service connections.
βοΈ Upgrades to storm sewer systems to improve drainage.
βοΈ Reconstruction of streets, curb and gutter, sidewalks, and driveway approaches within the project area.
βοΈRegrading and reseeding of boulevard areas.
Residents can expect temporary inconveniences during construction, including traffic detours, driveway access restrictions, construction noise, dust, and occasional short-term water shutoffs.
The contractor will work with residents to maintain access whenever possible and will provide advance notice of planned utility interruptions.
As part of the reconstruction, trees located within the public right-of-way (boulevard area) are expected to be removed due to conflicts with sidewalks, curb and gutter, and underground utilities. This work is necessary to reduce future maintenance issues and protect the new infrastructure.
The City understands construction can be disruptive and appreciates the patience and cooperation of residents throughout the project. Open communication between property owners, the contractor, engineer, and City staff will help ensure the project moves forward as smoothly as possible.
Additional project updates will be shared as construction progresses.