Wilton on Jackson Creek

Wilton on Jackson Creek Wilton was built in 1737 and is located in Westmoreland County on Jackson Creek near Hague, VA.

It is an excellent example of high Georgian style constructed of brick in Flemish bond with glazed headers.

When restoring the smokehouse, I found these 3 items hanging in the beams.  They were used for holding large pieces of m...
09/06/2026

When restoring the smokehouse, I found these 3 items hanging in the beams. They were used for holding large pieces of meat or a ham.

Cleaned them up, gave them a linseed oil bath and returned them to the smokehouse.

Finishing up shed roof off workshop.  Almost there!
09/04/2026

Finishing up shed roof off workshop. Almost there!

Putting up the wall between study & dining room.  Drywall that will have a lime product application that will make it ap...
09/02/2026

Putting up the wall between study & dining room.

Drywall that will have a lime product application that will make it appear more like traditional plaster.

More to follow…

Finished interior walls in dining room and study with wainscoting.Getting ready for September 12th!
08/29/2026

Finished interior walls in dining room and study with wainscoting.

Getting ready for September 12th!

Fired up the pit to roast some marshmallows!
08/29/2026

Fired up the pit to roast some marshmallows!

Wainscoting in the study completed where it goes up against wood framed walls.
08/24/2026

Wainscoting in the study completed where it goes up against wood framed walls.

Everyday we march a little closer to completion.  Starting to move some furniture pieces into the upper bedrooms.Much mo...
08/24/2026

Everyday we march a little closer to completion. Starting to move some furniture pieces into the upper bedrooms.

Much more will be placed prior to our September 12th event.

Tickets remain available till September 5th.

08/21/2026

Beautiful morning at Wilton!

Nothing pretty, but getting started on downstairs woodwork.Putting up wainscoting in study & dining room on wood framed ...
08/20/2026

Nothing pretty, but getting started on downstairs woodwork.

Putting up wainscoting in study & dining room on wood framed walls first. This job is what I’d call “low hanging fruit.” When I get to the brick walls, it becomes a little more challenging.

Tile roof install completed.  Next step is to wire brush the surface and apply a coat of rust converter before applying ...
08/19/2026

Tile roof install completed. Next step is to wire brush the surface and apply a coat of rust converter before applying roofing paint.