06/17/2026

June 17, 2026

Dear Residents and Businesses,

You are receiving this email to update you on the South Washington Avenue Reconstruction Project. All timelines listed below are subject to change due to weather conditions and/or construction productivity.

The work this week has been delayed for a couple days due to rain shortened days last week. Tomorrow and Friday Vinton is relaying a water main and sewer main across all 4 lanes of Washington Avenue at Fairfield Street, which involves a local closure. This local closure will allow access to Fairfield and businesses, however that access will need to be from either the north or the south.

Next week Monday, Vinton will relay a water service across all 4 lanes of Washington Avenue between Fairfield Street and Alyce Street. This work will involve a local closure. The local closure will allow access to all businesses, however that access will need to be from either the north or the south. Southbound traffic will be detoured using Lincoln Boulevard to Evergreen Boulevard to Pioneer Road and back to Washington Avenue. Northbound traffic will be detoured using Zeunert Street to Cardinal Avenue to Lincoln Boulevard and back to Washington Avenue. After this work is completed that should be the end the local closures for utilities. There may need to be some local closures in other phases but they should be fewer.

Next week Tuesday, Vinton Construction will work on a storm sewer relay at Zeunert. The end of Zeunert at Washington will be closed during this work.
Vinton’s grading crew has started removing the concrete pavement, digging to a depth of 16 inches and placing the new gravel base. They will work from south to north, moving past Pioneer early next week. At this point they will be skipping over Pioneer Road and Lincoln Boulevard.

Outside of the local closures, this phase of traffic control will close the two east lanes of Washington Avenue and flip both directions of traffic to the two west lanes. This closure will be extended south of Pioneer Road to the City limits next week.

We ask for your patience during the construction. The project is scheduled to be completed by November 6, 2026, but we are hoping for an earlier completion date. If you have any questions, concerns or special requests, please let me know. I can be reached at City Hall at (262) 375-7610 or email me at
[email protected].

Sincerely,

CITY OF CEDARBURG
Mike Wieser, P.E.
Director of Engineering & Public Works

06/10/2026

June 10, 2026

Dear Residents and Businesses,

You are receiving this email to update you on the South Washington Avenue Reconstruction Project. All timelines listed below are subject to change due to weather conditions and/or construction productivity.

The work this week has been delayed for one day due to the rain day last Friday. Today Vinton is relaying a water main across all 4 lanes of Washington Avenue at Concord Street, which involves a local closure. Tomorrow and Friday Vinton will be working on relaying a water service across all 4 lanes of Washington Avenue, which involves a local closure between Pioneer and Zeunert. These local closures will allow access to apartment buildings and businesses, however that access will need to be from either the north or the south.

Next week Monday and Tuesday, Vinton will relay a water main and sewer main across all 4 lanes of Washington Avenue at Fairfield Street. This work will involve a local closure at Fairfield Street. The local closure will allow access to all businesses and Fairfield Street, however that access will need to be from either the north or the south. Southbound traffic will be detoured using Lincoln Boulevard to Evergreen Boulevard to Pioneer Road and back to Washington Avenue. Northbound traffic will be detoured using Zeunert Street to Cardinal Avenue to Lincoln Boulevard and back to Washington Avenue.

Next week Wednesday, Vinton Construction will be relaying a water service across all 4 lanes of Washington Avenue at Concord Street, which will involve a local closure between Fairfield and Alyce. The local closure will allow access to all businesses, however that access will need to be from either the north or the south. Southbound traffic will be detoured using Lincoln Boulevard to Evergreen Boulevard to Pioneer Road and back to Washington Avenue. Northbound traffic will be detoured using Zeunert Street to Cardinal Avenue to Lincoln Boulevard and back to Washington Avenue.

Vinton will spend the rest of next week working on a storm sewer relay at Zeunert Street and finishing other tasks within the two-lane closure. The grading crew is still scheduled to be on site next week to begin the road work at the south end of the project.

Outside of the local closures, this phase of traffic control will close the two east lanes of Washington Avenue and flip both directions of traffic to the two west lanes. This closure will be extended south of Pioneer Road to the City limits next week.

We ask for your patience during the construction. The project is scheduled to be completed by November 6, 2026, but we are hoping for an earlier completion date. If you have any questions, concerns or special requests, please let me know. I can be reached at City Hall at (262) 375-7610 or email me at [email protected].

Sincerely,
CITY OF CEDARBURG
Mike Wieser, P.E.
Director of Engineering & Public Works

06/03/2026

🚶‍♀️🚲 Walk Your Wheels in Downtown Cedarburg 🛴

For the safety of everyone enjoying our downtown, please remember to walk your wheels while on the sidewalks along Washington Avenue between Sheboygan Road and Spring Street.

This ordinance applies to:
✅ Bicycles (including e-bikes)
✅ Scooters (including e-scooters)
✅ Skateboards
✅ Inline skates

Downtown sidewalks can be busy with shoppers, diners, families, and visitors. Walking your wheels helps keep our pedestrian areas safe and enjoyable for everyone.

Thank you for helping make Downtown Cedarburg a safe and welcoming place! 💙

https://www.facebook.com/RespectOurWaters/posts/1417764457048146
06/03/2026

https://www.facebook.com/RespectOurWaters/posts/1417764457048146

Chemicals found in automobiles can enter our waterways via storm drains if not properly handled. Contaminants such as motor oil and antifreeze pose severe human and environmental health hazards. When performing maintenance on your vehicle at home, do so responsibly by following these guidelines. Be sure to properly dispose of all waste chemicals at your local hazardous waste disposal site. Visit respectourwaters.org for more information.

06/03/2026

June 3, 2026

Dear Residents and Businesses,

You are receiving this email to update you on the South Washington Avenue Reconstruction Project. All timelines listed below are subject to change due to weather conditions and/or construction productivity.

There have been some changes in the work scheduled for this week. Vinton Construction will be working on sewer lateral reconnections, replacing a hydrant, water taps, and relaying a water service on the east side for the rest of this week. All this work will take place in the normal two-lane closure. There will be no more Local Closures across all 4 lanes of Washington the rest of this week.

Next week Monday, Wednesday and Thursday, Vinton will relay water laterals across all 4 lanes of Washington Avenue between Pioneer Road and Zeunert. Their plan would be to do one crossing each day. This work will involve roaming local closure between Pioneer and Zeunert depending on which lateral is being relaid. The local closures will allow access to all businesses, however that access will need to be from either the north or the south. Southbound traffic will be detoured using Lincoln Boulevard to Evergreen Boulevard to Pioneer Road and back to Washington Avenue. Northbound traffic will be detoured using Pioneer Road to Cardinal Avenue to Lincoln Boulevard and back to Washington Avenue.

Next week Tuesday, Vinton Construction will be relaying a water main across all 4 lanes of Washington Avenue at Concord Street, which will involve a local closure at Concord. The local closure will allow access to the apartment buildings, however that access will need to be from either the north or the south. Southbound traffic should detour using Pioneer Road to STH 181 to Bonniwell Road. Northbound traffic will be detoured using Bonniwell Road to Green Bay Road to Pioneer Road and back to Washington Avenue.

Vinton Construction is planning to have their grading crew on site beginning the week of June 15 to begin the road work starting at the south end of the project.

Outside of the local closures, this phase of traffic control will close the two east lanes of Washington Avenue and flip both directions of traffic to the two west lanes. This closure will be extended south of Pioneer Road to the City limits next week.

We ask for your patience during the construction. The project is scheduled to be completed by November 6, 2026, but we are hoping for an earlier completion date. If you have any questions, concerns or special requests, please let me know. I can be reached at City Hall at (262) 375-7610 or email me at [email protected].

Sincerely,
CITY OF CEDARBURG
Mike Wieser, P.E.
Director of Engineering & Public Works

05/29/2026

May 29, 2026

Dear Residents and Businesses,

You are receiving this email to update you on the South Washington Avenue Reconstruction Project. All timelines listed below are subject to change due to weather conditions or equipment breakdowns.

Due to complications in today’s work, Vinton Construction will need to resume the closure of all 4 lanes of Washington Avenue just north of Zeunert Street on Monday. This is to replace a sewer line across Washington Avenue. They will have this section of Washington Avenue open for the weekend with gravel trenches.

Beginning next Tuesday, Vinton will relay multiple water laterals across all 4 lanes of Washington Avenue between Pioneer Road and Zeunert. Their plan would be to do one crossing each day. This work will involve roaming local closure between Pioneer and Zeunert depending on which lateral is being relaid. The local closures will allow access to all businesses, however that access will need to be from either the north or the south. Southbound traffic will be detoured using Lincoln Boulevard to Evergreen Boulevard to Pioneer Road and back to Washington Avenue. Northbound traffic will be detoured using Pioneer Road to Cardinal Avenue to Lincoln Boulevard and back to Washington Avenue.

Outside of the local closures, this phase of traffic control will close the two east lanes of Washington Avenue and flip both directions of traffic to the two west lanes. This closure will be extended south of Pioneer Road to the City limits next week.

These dates are subject to change due to weather conditions and/or construction productivity. We ask for your patience during the construction. The project is scheduled to be completed by November 6, 2026, but we are hoping for an earlier completion date. If you have any questions, concerns or special requests, please let me know. I can be reached at City Hall at (262) 375-7610 or email me at [email protected].

Sincerely,
CITY OF CEDARBURG
Mike Wieser, P.E.
Director of Engineering & Public Works

05/28/2026

May 28, 2026

Dear Residents and Businesses,

You are receiving this email to update you on the South Washington Avenue Reconstruction Project. All timelines listed below are subject to change due to weather conditions or equipment breakdowns.

Vinton Construction has completed their work at Alyce Street and should open the intersection sometime today when the temporary asphalt has cooled down. There will be the local closure tomorrow just north of Zeunert as was specified in last week’s update.

Next week Vinton will relay multiple water laterals across all 4 lanes of Washington Avenue between Pioneer Road and Zeunert. Their plan would be to do one crossing each day. This work will involve roaming local closure between Pioneer and Zeunert depending on which lateral is being relaid. The local closures will allow access to all businesses, however that access will need to be from either the north or the south. Southbound traffic will be detoured using Lincoln Boulevard to Evergreen Boulevard to Pioneer Road and back to Washington Avenue. Northbound traffic will be detoured using Pioneer Road to Cardinal Avenue to Lincoln Boulevard and back to Washington Avenue.

Vinton’s second crew will be leaving after this week.

Outside of the local closures, this phase of traffic control will close the two east lanes of Washington Avenue and flip both directions of traffic to the two west lanes. This closure will be extended south of Pioneer Road to the City limits next week.

We Energies has completed their work on Fairfield Street.

These dates are subject to change due to weather conditions and/or construction productivity. We ask for your patience during the construction. The project is scheduled to be completed by November 6, 2026, but we are hoping for an earlier completion date. If you have any questions, concerns or special requests, please let me know. I can be reached at City Hall at (262) 375-7610 or email me at [email protected].

Sincerely,
CITY OF CEDARBURG
Mike Wieser, P.E.
Director of Engineering & Public Works

05/26/2026

May 26, 2026

To: Residents within the 2026 Street & Utility Project

Fair Street (Evergreen Boulevard to Washington Avenue)
Dorner will begin the road work the week of June 1st which should take about a week. The road work consists of removing 14 inches existing asphalt, base and spreading 9 inches of new gravel base. The road work will be followed by concrete work.

Franklin Avenue (Fair Street to Pine Street & Walnut Street to Bridge Road)
Rennhack Construction will start working on the concrete work on May 27th. This concrete work will likely take about a week.

Madison Avenue (Fair Street to Walnut Street)
Dorner has begun the road work which should take about a week. The road work consists of removing 14 inches existing asphalt, base and spreading 9 inches of new gravel base. The road work will be followed by concrete work.

St. John Avenue (Washington Avenue to Bridge Road)
Dorner will continue relaying the sanitary sewer. This work will be followed by the water main and sewer/water lateral relays.

Elm Street (St. John Avenue to Washington Avenue)
Dorner will begin relaying the water main the week of June 1st. This work will be followed by the sewer/water lateral relays.

Cedar Ridge Drive (Orchard Drive to Bridge Road)
Dorner will then begin the road work the week of June 9th. The road work consists of removing 14 inches existing asphalt, base and spreading 9 inches of new gravel base. The road work will be followed by concrete work.

All Streets continue to be closed to thru-traffic. Due to the construction, roadway access and driveway access may be limited during working hours but will be restored at the end of the day.

These dates are subject to change due to weather conditions and/or construction productivity. We ask for your patience during the construction. The work on Fair Street, Madison Avenue, and Franklin Avenue will be completed by July 24, 2026, while the work on St. John Avenue, Elm Street and Cedar Ridge Drive will be completed by August 28, 2026. If you have any questions, concerns or special requests, please let me know. I can be reached at City Hall at (262) 375-7610 or email me at [email protected].

Sincerely,

CITY OF CEDARBURG
Mike Wieser, P.E.
Director of Engineering & Public Works

05/21/2026

May 21, 2026

Dear Residents and Businesses,

You are receiving this email to update you on the South Washington Avenue Reconstruction Project. All timelines listed below are subject to change due to weather conditions or equipment breakdowns.

Vinton Construction has completed the sanitary sewer main. The Lincoln Boulevard and Washington Avenue intersection will open possibly today but for sure sometime tomorrow.

On Tuesday and Wednesday of next week, Vinton will relay a sewer and water line across all 4 lanes of Washington Avenue at Alyce Street. This work will involve a local closure in the vicinity of Alyce Street. The local closure will allow access to all businesses, however that access will need to be from either the north or the south. Southbound traffic will be detoured using Lincoln Boulevard to Evergreen Boulevard to Pioneer Road and back to Washington Avenue. Northbound traffic will be detoured using Zeunert Street to Cardinal Avenue to Lincoln Boulevard and back to Washington Avenue.

On Thursday of next week, no local closures are anticipated.

On Friday of next week, the local closure will move to just north of Zeunert Street to allow for a sewer/water line replacement across all 4 lanes of Washington Avenue. The local closure will allow access to all businesses, however, that access will have to be either from the north or the south. The same detours will apply.

Vinton also has a second crew on site doing catch basin replacements working from south to north.

Outside of the local closures, this phase of traffic control will close the two east lanes of Washington Avenue and flip both directions of traffic to the two west lanes. This closure will be extended south of Pioneer Road to the City limits next week.

We Energies is continuing their work on Fairfield Street.

These dates are subject to change due to weather conditions and/or construction productivity. We ask for your patience during the construction. The project is scheduled to be completed by November 6, 2026, but we are hoping for an earlier completion date. If you have any questions, concerns or special requests, please let me know. I can be reached at City Hall at (262) 375-7610 or email me at [email protected].

Sincerely,
CITY OF CEDARBURG
Mike Wieser, P.E.
Director of Engineering & Public Works

05/12/2026

May 12, 2026

Dear Residents and Businesses,

You are receiving this email to update you on the South Washington Avenue Reconstruction Project. All timelines listed below are subject to change due to weather conditions or equipment breakdowns.

Vinton Construction continues to relay the sanitary sewer heading north and will likely complete the sanitary sewer early next week. To complete the sanitary sewer, they will need to close the Washington Avenue and Lincoln Boulevard intersection in all directions and Washington Avenue 220 feet north of Lincoln. This closure will begin tomorrow (Wednesday, May 13th) and last approximately a week and a half to allow the contractor to also complete other work in the intersection. Washington Avenue will be detoured using Zeunert Street to Cardinal Avenue to Lincoln Boulevard to Johnson Avenue to Hamilton Road and vice versa. Lincoln Boulevard will be detoured using Evergreen Boulevard to Western Road to Washington Avenue to Hamilton Road to Johnson Avenue and vice versa.

Vinton will then move onto connecting sewer laterals on the east side of Washington to the new main and relaying sewer/water crossings to the west side of Washington. The sewer/water crossings will require some local road closures which entail closing all four lanes for a segment of roadway. Access to driveways will be from either side of the local closure. Updates will be given with specific details on these local closures when that time comes.

Outside of the local closures, this phase of traffic control will close the two east lanes of Washington Avenue and flip both directions of traffic to the two west lanes. This closure will be extended south of Pioneer Road to the City limits next week.

We Energies has completed their gas replacement work in the Washington and Lincoln intersection and moved on to the gas replacement work on Fairfield Street. This work should take a couple of weeks.

We ask for your patience during the construction. The project is scheduled to be completed by November 6, 2026, but we are hoping for an earlier completion date. If you have any questions, concerns or special requests, please let me know. I can be reached at City Hall at (262) 375-7610 or email me at [email protected].

Sincerely,

CITY OF CEDARBURG
Mike Wieser, P.E.
Director of Engineering & Public Works

Address

W59N306 Johnson Avenue
Cedarburg, WI
53012

Alerts

Be the first to know and let us send you an email when City of Cedarburg Engineering & Public Works posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share