Work Completed This Week: Sept 11, 2026

Restoration/seeding disturbed areas on project
Poured sidewalk down alley (north of Main - between 8thand 9th)
Poured curb and gutter on 8th ave (north of Main)


Next Week:



Pour sidewalks on 8th ave (north of Main) and 9th ave
Lining of sanitary sewer down alley (north of Main) โ€“ day scheduled is Thursday, 9/17


Following Week:



Paving of 8th ave (north of Main), village parking lot, food pantry parking lot.

09/04/2026

STREET PROJECT UPDATE: SEPT. 4TH
Work Completed This Week:

Paved second/top layer of asphalt on Meadow Ln, as well as the driveways on Meadow
Finish road building on 8th, (north of Main)
Restoration on completed portions of the project


Next Week:



Pour curb and gutter on 8th ave (north of Main)
Pour sidewalks on 8th ave (north of Main) and down alley (north of Main - between 8th and 9th)


Following Week:



Paving of 8th ave (north of Main), village parking lot, food pantry parking lot.
Lining of sanitary sewer down alley (north of Main) โ€“ tentative day scheduled is 9/17

Mark Your Calendars: Village Of Baldwin Clean-Up Days are scheduled for September 25th (3pm-6pm) and September 26th (8am...
09/01/2026

Mark Your Calendars: Village Of Baldwin Clean-Up Days are scheduled for September 25th (3pm-6pm) and September 26th (8am-12pm). For a comprehensive list of accepted items and associated fees, please visit our official website at www.villageofbaldwin.com.

08/31/2026

Village of Baldwin CHLORINATION OF WATER update: chlorination was ended on Wednesday, August 26th. The taste of your water may not return to normal until this coming weekend, as the chlorine needs to work through the water supply. Chlorination is needed usually during street projects etc. as water mains get agitated. Testing is done constantly during this time, and all regulated times throughout the year.
We hope your water is tasting great by the weekend! The Village Public Works Department works hard to maintain a great tasting water supply in the Village.

08/28/2026

STREET PROJECT UPDATE:
Work Completed This Week:

Poured sidewalks on 8th ave (South of Main)
Poured concrete driveway approaches on Meadow Ln
Installed sanitary and water services to lots on 8th, (north of Main)
Finished storm sewer work on 5th/Elm
Prepped Community Food Pantry parking lot for paving
Began road building on 8th, (north of Main)


Next Week:



Pour curb and gutter on 8th ave (north of Main)
Pour sidewalks on 8th ave (north of Main) and down alley (north of Main - between 8th and 9th)
Finish road building on 8th, (north of Main)


Following Week:



Paving of 8th ave (north of Main), village parking lot, food pantry parking lot. Also planning to do a second layer of asphalt on Meadow Ln

Always a great way to start your Saturday right here in Baldwin!
08/28/2026

Always a great way to start your Saturday right here in Baldwin!

08/26/2026

VILLAGE OF BALDWIN
PUBLIC NOTICE
VACANCY ON VILLAGE BOARD
The Village of Baldwin has one trustee seat open due to a resignation. The public is invited to indicate interest in being appointed to this position by filling out an application/form of interest form.
REQUIREMENTS โ€“ Must be of legal voting age (18), live within the Village of Baldwin and be able to attend regular board meetings held the second Wednesday of every month and attend various committee meetings through the year.
TERM OF OFFICE โ€“ 2-year term (Sept. 9, 2026 โ€“ April , 2028)
HOW TO APPLY/SHOW INTEREST โ€“ All interested qualified residents are invited to fill out an application/interest form, which can be found at the village administrative office (400 Cedar St) or online at www.villageofbaldwin.com.
PROCESS FOR APPOINTMENT โ€“ The Village Board has the right and privilege to appoint a new board member. All interested residents should plan on attending the September 9th, 2026 Regular Board Meeting (6:00pm). Each candidate will introduce themselves to the board and answer any questions they might have. The board will then vote on who to appoint. An Oath of Office and appointment will take place immediately.
DEADLINE โ€“ Submissions of interest are due in the Administrative Office, 400 Cedar St, Baldwin by September 9th, 2026 at 4:30pm. Submissions can be emailed to [email protected], dropped off in person or placed in the drop box outside the Municipal Building.
QUESTIONS? Contact Jodi Peterson, Village Clerk, 715.684.3426 x117, [email protected]

Beautiful way to start your Saturday!
08/22/2026

Beautiful way to start your Saturday!

08/17/2026

Street Project Updates:

Work Completed Last Week:

โ€ข Built up road base on 8th ave (South of Main)
โ€ข Restored gravel and prep south alley for asphalt (east of 8th - between Maple and Main)
โ€ข Finished installation of sanitary on 8th, (north of Main)
โ€ข Started water main on 8th, (north of Main)

This Week:

โ€ข Curb and gutter and sidewalks on 8th ave (South of Main)
โ€ข Paving Meadow, Maple, and 8th (south of Main)
โ€ข Finish water main on 8th, (north of Main)
โ€ข Install storm drain on 9th ave

Following Week:

โ€ข Curb and gutter and sidewalks on 8th ave (north of Main)
โ€ข Storm sewer work on 5th/Elm