05/06/2026
Another successful round of AToN…this time in Chesapeake Bay. Our crew conducted a mooring inspection, completed new chain work, verified and installed new lights, and repositioned an aid to its correct location — all to help ensure the safety of mariners navigating our waterways. Proud of the teamwork from every department whose work not only keeps these critical waterways safe and reliable, but keeps our ship and equipment running, our crews fed and healthy, the supplies we need flowing and the admin cranking so we can focus on the mission ⚓️
Thanks to MK1 Loe, BM3 Miller, BM3 Green, SN Rose, and ENS Baity for the pictures 📸