State University Construction Fund

State University Construction Fund The Fund is a public benefit corporation whose mission is to act as an agent for SUNY to design, construct, acquire and improve SUNY facilities.

Ribbon Cutting Ceremony: Cornish and Van Hoesen Halls, SUNY CortlandFrom left to right: President Erik J. Bitterbaum; St...
04/03/2026

Ribbon Cutting Ceremony: Cornish and Van Hoesen Halls, SUNY Cortland
From left to right: President Erik J. Bitterbaum; Student Government Association President, Parker Arenas; Associate Vice President for Facilities Management, Chris Maroney; Associate Project Coordinator for the Fund, Todd Ewen.

SUNY Cortland officially cut the ribbon on Friday, March 27, celebrating the completion of a major renovation of Cornish and Van Hoesen Halls on the SUNY Cortland campus. The two‑and‑a‑half‑year, $27 million project included extensive interior and exterior renovations, expanding space and centralizing student services.
The project focused on Wing C of Cornish Van Hoesen Hall, upgrading facilities for the Communication and Media Studies Department and consolidating program spaces to support current campus needs. Renovations included new finishes, mechanical, electrical, plumbing, and fire protection systems, along with a new entrance addition featuring an elevator and stair tower to improve accessibility and connectivity to the Quad.

03/03/2026

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction. State University Construction Fund. SUCF Project 091072-00. Renovate Netzer Hall.
The work of this single bid project includes: a. Replacement of all existing windows; b. Upgrading the building’s mechanical, electrical, and plumbing systems; c. Retention of the brick pier façade with the addition of new glazing; d. Demolition and reconstruction of interior areas to create updated layouts, including new partitions, finishes, and circulation paths; e. Installation of a geothermal well field and connection to a new heating and cooling system; f. Building envelope improvements; g. Full systems replacement; h. Interior renovation; i. Integration of new geothermal infrastructure.
To learn more about this project, visit the Fund's Bid Calendar: https://tinyurl.com/unjy3dnd or the New York State Contract Reporter: https://tinyurl.com/mry99dhd

Ribbon Cutting Ceremony: Foster Hall, University at BuffaloPresident Satish K. Tripathi (first photo) celebrated the gra...
03/03/2026

Ribbon Cutting Ceremony: Foster Hall, University at Buffalo
President Satish K. Tripathi (first photo) celebrated the grand reopening of Foster Hall on Friday, February 27, 2026, on the University at Buffalo’s South Campus, marking the return of the Graduate School of Education to its original home. The historic 1921 building was fully renovated and restored, transforming it into a modern hub for learning, research, and collaboration.
The project achieved LEED Gold certification and included new building systems, stairways, an elevator, a slate roof, updated windows and doors, and site improvements with new landscaping and an accessible plaza.

01/23/2026

Career Opportunity: The Fund is seeking a Junior Accountant to join our team in Albany, NY. The Junior Accountant is responsible for the detailed desk audit in connection with the processing of consultant and contractor requests for payment.

Are you a good fit? Explore the full job posting here: https://tinyurl.com/4bstvj4m

01/12/2026

Career Opportunity: The Fund is seeking a Helpdesk Technician to join our team in Albany, NY. The Helpdesk Technician provides hardware and user software support to SUCF staff. The occupant addresses day to day user issues and assists with new hardware / software deployment.
Are you a good fit? Explore the full job posting here: https://tinyurl.com/4bstvj4m

01/07/2026

Career Opportunity: The Fund is seeking a Deputy General Manager to join our team in Albany, NY. This Officer-level position provides strategic leadership for the Division of Administrative and Operational Services, overseeing day-to-day operations of the Fund. The role manages key departments including Capital Program Management and Finance, Capital Procurement, Controller Services, Information Services, and Opportunities. Reporting directly to the Executive Deputy General Manager, the Deputy General Manager works closely with the Deputy General Manager for Design and Construction and serves as a core member of the General Manager’s Executive team.
Are you a good fit? Explore the full job posting here: https://tinyurl.com/4bstvj4m

12/24/2025

Bidding Opportunity – Construction Vertical: Building Construction, Rehab & New Construction. Renovate 1st Floor for Psychology Labs & Clinic – Farber Hall at SUNY Buffalo. Project: 281016-00
Scope: The work of this single bid project includes: a. Full gut interior renovation of an 11,500 GSF space in the Northwest corner of Farber Hall; b. Creation of new office spaces, participant and control rooms, and specialty lab spaces for the Psychology department; c. Hazardous materials abatement; d. Removal and reconfiguration of partitions and demising walls; e. Removal and replacement of HVAC distribution equipment; f. Rooftop unit replacement on new dunnage; g. Installation of new lighting and lighting controls; h. New finishes throughout.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/bd28kbdf or visit the New York State Contract Reporter: https://tinyurl.com/y356tpzx

12/24/2025

Bidding Opportunity – Construction Vertical: Building Construction, Rehab & New Construction. Replace Roof – Goodyear Dining Hall at SUNY Buffalo. Project: 281055-01
Scope: The work of this single bid project includes: a. Abatement of EPDM roofing system; b. Installation of modified bitumen roofing system; c. Extension of existing roof exhaust; d. Installation of curbing for future use; e. Replacement of existing roof drainage and limited internal drainage system; f. Installation of fall protection system; g. New ladders and walk pads.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/bd28kbdf or visit the New York State Contract Reporter: https://tinyurl.com/mpwb6r36

12/24/2025

Career Opportunity: The Fund is seeking an Associate Counsel to join our team in Albany, NY. This role will provide legal advice and counsel to the Fund, ensuring compliance with all applicable laws and regulations. They will support strategic initiatives and our mission while proactively identifying and addressing potential legal issues with creativity and precision.
Are you a good fit? Explore the full job posting here: https://tinyurl.com/4bstvj4m

12/17/2025

JOCS Bidding Opportunity – Construction Vertical: Building Construction, Rehab & New Construction. Job Order Contracts: Rochester/Buffalo Regions. Project 801703-00.
Scope: Job Order Contracts are term construction contracts that require the contractor to perform an ongoing series of small to medium sized, critical maintenance and repair projects and minor new construction projects in certain counties of NYS for SUNY campuses and programs. Bid documents include Construction Task Catalogs® that contain pre-set unit prices for a wide variety of construction tasks specifically designed for the State University Construction Fund. Bidders will bid Adjustment Factors to be applied to these unit prices. Maximum contract value per term: $2M.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/bd28kbdf or visit the New York State Contract Reporter: https://tinyurl.com/53vd2fzr

12/17/2025

Bidding Opportunity: Construction Vertical, Building Construction, Rehabilitation & New Construction – Construction. SUNY at Buffalo. Project 281054-01. Replace Roof – Downtown Gateway Building. The work of this single bid project includes: a. Abatement of EPDM roofing systems; b. Removal of perimeter roof edge systems and flashing; c. Installation of modified bitumen roofing system and liquid applied roof, roof edge system, and flashing; d. Construction of round masonry chimney to enclose existing stainless-steel stack; e. Installation of (2) RTU and (2) exhaust fans; f. Installation of lightning protection system; g. New ladders; h. Replacement and repair of existing capstones; i. Scaffolding installation for protection and access to roof; j. Roof tie-off and fall protection to be installed.

To learn more about this project, view the Fund's Bid Calendar: https://tinyurl.com/mddv5hnb or visit the New York State Contract Reporter: https://tinyurl.com/ycyxejxf

Address

353 Broadway
Albany, NY
12246

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Alerts

Be the first to know and let us send you an email when State University Construction Fund posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share