28/10/2014
Temperature and gravity issue.
Marketing Discipline Guide linesfor RO / SKO Dealerships of Public Sector Marketing Companies of India
The dealer to undertake the following actions:
Park the tank lorry on level ground – allow 10 minutes settling time.
Before starting the operation on the tank lorry, proper earthing /
bonding should be ensured. Portable fire extinguisher of DCP type
should be kept near to tank lorry at a suitable distance. All the tank
lorry discharge hoses should comply with all the safety requirements,
and under no circumstances, plastic/PVC hosepipes should be used.
ii) Check condition of the seal / security lock on the tank lorry delivery
manifold & manhole covers against those mentioned in the invoice.6
iii) Release master valve levers to ensure product fills the pipelines, where
tank lorries are normally calibrated with lines full, before checking dips
(Refer Calibration Certificate).
iv) Dealer to check that the Density of product @ 15 Degree C using ASTM Tables (53B) is within +/- 3.0 Kg/M3 as compared with the challan density for ascertaining quality of product.
v) Ask the tank lorry driver to produce certificate of calibration which
would mention product level and proof level details.
vi) Check Weights & Measures markings on the dip rod at the bottom as
well as at the proof level. As an additional check, verify dip rod
calibration with an standard measuring tape.
vii) Check dips of the product in all compartments with the dip rod duly
certified by Weights & Measures Department and provided with the tank
lorry. Also check for presence of water in each compartment by water
finding paste. Before commencing tank lorry decantation operation, the
sales from the concerned underground tank at the Retail outlet should
be stopped till the completion of decantation.
viii) Having ascertained the quantity of the product by the above method,
draw samples after draining approx. 20 liters of the product from the
manifold from each compartment in a clear glass container for
density/temperature for quality checks.
ix) In case of doubt as to the quality of product, contact the Supply
Location/concerned Area Field Officer for further instructions.
x) After having ascertained quality as per (vii to ix) above, and prior to
decantation, the dealer/his representative shall draw bottom samples
from the Tank lorry and follow instructions as given in 3 tier sampling
procedure (as explained in chapter-2).7
xi) In the event of dip being short as per calibration certificate/water being
detected with water finding paste, the short dip/quantity (including due
to removal of water) should be made up by filling to the correct level
through the dispensing pump and the quantity so filled should be
recorded on the back of all the Invoice copies. Chamber-wise observed
dip and quantity filled through dispensing unit for getting correct level
to be recorded. In case the RO is dry at the time of receipt, measuring
of shortage to be done by drawing product from other compartment and
using calibrated measure. Shortages so recorded should be signed both
by dealer/dealer’s representative and tank lorry driver. After
ascertaining quality & quantity, decant the product in the correct
underground tanks.
xii) After decanting the product, ensure that the tank lorry is fully emptied
of the product before releasing the tank lorry.
xiii) Make appropriate entries in the stock register/stock display board.
xiv) After decanting the product into the tank, at least 50 liters of product
(to displace the line content) should be dispensed through the pump
before taking sample from pump nozzle for ascertaining the density of
the composite product in the storage tank after receipt. The density at
15 Degrees C, thus ascertained should be recorded in the density
register. The density records should be maintained in the format
attached as Annexure 1.
FOR FURTHER DETAILS PLEASE GO THROUGH .
http://www.iocl.com/uploads/MDG_11jan2013.pdf