Municipal Engineering Office - San Isidro Leyte

Municipal Engineering Office - San Isidro Leyte Official Page of the Municipal Engineering Office of the Local Government Unit of San Isidro, Leyte

๐Ÿ“ข WATER SUPPLY SCHEDULE ADVISORYThe Municipal Engineering Office informs all water consumers that the following water su...
09/06/2026

๐Ÿ“ข WATER SUPPLY SCHEDULE ADVISORY

The Municipal Engineering Office informs all water consumers that the following water supply schedule shall be implemented to ensure a fair and equitable distribution of water throughout the service area.

This schedule adjustment is being implemented due to the increasing volume of water demand and the effects associated with the starting phase of the Super El Niรฑo phenomenon, which may impact the availability of our water resources.

๐Ÿ’ง LINE 1 (Bawod & Capiรฑahan)
โ€ข Monday
โ€ข Wednesday
โ€ข Friday
โ€ข Sunday

๐Ÿ’ง LINE 2 (M.L. Quezon Street, Motor & Labangon)
โ€ข Tuesday
โ€ข Thursday
โ€ข Saturday

We encourage everyone to use water responsibly and practice water conservation measures to help ensure sufficient supply for all households.

Please be advised that the schedule may be adjusted as necessary due to maintenance activities, emergencies, or other unforeseen circumstances.

We appreciate your understanding, cooperation, and continued support as we work together to manage our water resources effectively.

WATER SERVICE INTERRUPTIONThere will be a temporary water service interruption affecting the entire coverage area of the...
15/02/2026

WATER SERVICE INTERRUPTION

There will be a temporary water service interruption affecting the entire coverage area of the San Isidro Waterworks System due to scheduled maintenance works on February 16, 2026.

Water supply will resume immediately after the completion of maintenance activities.

Thank you for your understanding.

Clearing Operations - Brgy. Bawod
16/01/2026

Clearing Operations - Brgy. Bawod

๐Ÿ‘๐Ÿผ
06/01/2026

๐Ÿ‘๐Ÿผ

๐— ๐—”๐—š๐—ž๐—”๐—ก๐—ข ๐—”๐—ก๐—š ๐—•๐—”๐—ฌ๐—”๐—— ๐—ฆ๐—” ๐—•๐—จ๐—œ๐—Ÿ๐——๐—œ๐—ก๐—š ๐—ฃ๐—˜๐—ฅ๐— ๐—œ๐—ง?
Isa ito sa pinaka-karaniwang tanong kapag magpapatayo ng bahay o gusali. Marami ang nagugulat dahil akala nila โ€œmaliit langโ€ ang building permit โ€” pero sa totoo lang, may basehan at proseso ito.

๐—”๐—ก๐—ข ๐—”๐—ก๐—š ๐—•๐—œ๐—ก๐—”๐—•๐—”๐—ฌ๐—”๐—ฅ๐—”๐—ก?
Ang building permit ay hindi lang isang papel. Ito ay binubuo ng ibaโ€™t ibang fees na dumadaan sa pagsusuri ng LGU.

๐— ๐—š๐—” ๐—ž๐—”๐—ฆ๐—”๐— ๐—” ๐—ฆ๐—” ๐—•๐—”๐—ฌ๐—”๐——:
โ€ข Building Permit Fee
โ€ข Electrical Permit
โ€ข Plumbing Permit
โ€ข Mechanical Permit (kung meron)
โ€ข Zoning Clearance
โ€ข Fire Safety Evaluation Fee
โ€ข Line and Grade Fee
โ€ข Contractorโ€™s Tax
โ€ข Documentary Stamp at iba pang regulatory fees

๐— ๐—”๐—š๐—ž๐—”๐—ก๐—ข ๐—œ๐—ง๐—ข ๐—ž๐—”๐——๐—”๐—Ÿ๐—”๐—ฆ๐—”๐—ก?
Sa pangkalahatan, ang building permit cost ay nasa โ€œhumigit-kumulangโ€:
โ€ข ๐Ÿญ% hanggang ๐Ÿฎ% ng estimated construction cost
(depende sa LGU, laki ng proyekto, at uri ng building)
Halimbawa:
Kung ang estimated cost ng bahay ay โ‚ฑ3,000,000
Maaaring nasa โ‚ฑ30,000 hanggang โ‚ฑ60,000 ang total permit fees

๐—•๐—”๐—ž๐—œ๐—ง ๐— ๐—”๐—›๐—”๐—Ÿ๐—”๐—š๐—” ๐—”๐—ก๐—š ๐—•๐—จ๐—œ๐—Ÿ๐——๐—œ๐—ก๐—š ๐—ฃ๐—˜๐—ฅ๐— ๐—œ๐—ง?
โ€ข Legal ang construction
โ€ข Nasusunod ang National Building Code
โ€ข Mas ligtas ang istruktura
โ€ข Iwas-demolition at penalties
โ€ข Kailangan sa future selling o loan ng property

๐—ฃ๐—”๐—”๐—Ÿ๐—”๐—Ÿ๐—”:
Magkakaiba ang singil bawat LGU. Laging i-check ang latest schedule of fees ng inyong city o municipality at siguraduhing kumpleto ang pirma ng mga licensed professionals.
Kung may balak kang magpatayo, mas mainam na i-budget na agad ang building permit para iwas delay sa construction.





๐Ÿ“ข OFFICIAL STATEMENT โ€“ LGU SAN ISIDRO ENGINEERING OFFICERegarding the circulating post about the road project in Sitio D...
09/12/2025

๐Ÿ“ข OFFICIAL STATEMENT โ€“ LGU SAN ISIDRO ENGINEERING OFFICE

Regarding the circulating post about the road project in Sitio Danao, Brgy. Basud, we clarify that:

โ€ข The poured concrete is only one lane because it is the portion that has already been properly compacted and passed inspection.
โ€ข The project follows the approved Program of Works and engineering standards.
โ€ข The soil seen beside the concrete is not the base layer, but tire and foot marks caused by continuous use and softened further by recent heavy rains.
โ€ข Remaining sections will be poured once compaction and preparatory works are completed.

The project implementation follows standard operating procedures, and public funds are being properly utilized for the benefit of the community. This reflects our commitment to delivering a reliable and safe roadway for the people of San Isidro.

Daghang salamat sa inyong pagsabot ug suporta. ๐Ÿ’š

Emergency Clearing Operation with PNP-SAF at Brgy. Banat I
25/09/2025

Emergency Clearing Operation with PNP-SAF at Brgy. Banat I

Emergency Clearing Operation at Hda Maria
25/09/2025

Emergency Clearing Operation at Hda Maria

Address

Ground Floor, M. Roxas Street , Brgy. Bawod
San Isidro
6535

Opening Hours

Monday 8am - 5pm
Tuesday 8am - 5pm
Wednesday 8am - 5pm
Thursday 8am - 5pm
Friday 8am - 5pm

Website

Alerts

Be the first to know and let us send you an email when Municipal Engineering Office - San Isidro Leyte posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share