28/07/2025
The Building Maintenance Team completed its work for the week (July 21 - 26, 2025).
SECTIONS:
Air-conditioning:
• Repaired and troubled shot of the window-type aircon and changed the capacitor of the floor-mounted aircon at CHO – Sanitary Section.
• Charged freon to 2-unit split-type aircon at MISO.
• Installed aircon drainage at CSWS (Children & Youth).
• Charged freon to 1-unit wall-mounted split-type aircon at OPD – CHO.
• Cleaned 1-unit split-type aircon at BM office.
• Charged freon at MCPO.
• Troubled shot and charged freon to 1-unit floor-mounted split-type aircon at Public Market (OPCEN).
• Troubled shot and charged freon of 2-unit split-type aircon at the Police Clearance office.
• Cleaned 4-unit floor-mounted aircon at the Vice Mayor’s office and the City Assessors office.
Carpentry:
• Dismantled cubicles at the City Legal office.
• Repaired ceiling of Motorpool office.
• Installed tiles at CHO Cr.
• Assembled 1 office table at CEO.
• Installed ceiling at CHO Cr.
• Renovation of Daycare Center at MGLP.
• Repaired ceiling at MCENRO office.
• Cutting of woods for the Engineering office.
• Renovation of Daycare Center at MGLP.
• Installed sealant at the entrance door and repaired tiles at City Hall.
• Installed metal parring at CHO Cr.
• Installed sealant at sliding window at CHO (Dr. Catulong’s office).
Electrical:
• Pulled out convenience outlet at old City Legal office.
• Replaced busted bulb at City Nutrition office.
• Installed decorative lights at Plaza ground.
• Replaced busted bulb and fluorescent tube at Command Center.
• Repaired fluorescent diffuser at SP office.
• Pulled out and condemned electrical lighting due to damage to the ceiling at MCENRO.
• Installation of convenience outlet & provision of power source for Led wall TV at PESO office.
• Repaired aircon outlet and replaced busted lamp at Motorpool office.
• Replaced busted Led bulb and Led tube at SAMHSO.
• Replaced busted bulb at BAC office.
• Activation of the generator set at the Parking building.
• Installed additional lights at the 2nd floor female CR at City Hall.
• Replaced busted bulb at SP office.
• Wired and installed a 60A switch for the electrical supply power source for the welding machine at MCC.
Painting:
• Painting of tables and repainting of the Motorpool office.
• Skim coating of ceiling at CHO Cr.
• Repainting of the Motorpool office.
• Painting of office table at Motorpool for Mayor’s office.
• Painting of CHO Cr.
Plumbing:
• Repaired lavatory and downspout at Cong. Office.
• Repaired artesian well at Sitio San Jose, Brgy. Jagobiao.
• Repaired artesian well at Sitio Sto. Rosario, Purok Goma, Brgy. Jagobiao.
• Repaired artesian well at Sitio Lourdes, Brgy. Jagobiao.
• Repaired artesian well at Sitio Sliding Hills, Brgy. Labogon.
• Repaired artesian well at Sitio Sta. Cruz, Purok Diamond, Brgy. Jagobiao.
Welding:
• Ongoing fabrication and installation for school expansion of MCC.
To our immediate heads, thank you. Engr. Marivic Cabigas, Department Head, Engr. Lee S. Naya, Division Chief; Mr. Dominador A. Ermac, Assistant Division Chief; AR. Francis P. Cabigas, Admin Chief.