Municipal Engineer's Office - Hamtic

Municipal Engineer's Office - Hamtic Official Page of the Municipal Engineer's Office - LGU Hamtic

Typhoon Damage Assessment Together with MDRRMOLocation: Botbot,Hamtic, Antique
02/09/2023

Typhoon Damage Assessment Together with MDRRMO

Location: Botbot,Hamtic, Antique

JOINT INSPECTION TOGETHER WITH MDRRMO AND MPDC.Location: Puao, Hamitc, Antique
17/07/2023

JOINT INSPECTION TOGETHER WITH MDRRMO AND MPDC.

Location: Puao, Hamitc, Antique

CONSTRUCTION OF WATER SYSTEM JOINT INSPECTIONImplementing office: BLGULocation: Botbot, Hamtic, Antique
11/07/2023

CONSTRUCTION OF WATER SYSTEM JOINT INSPECTION
Implementing office: BLGU
Location: Botbot, Hamtic, Antique

JOINT INSPECTION Location: Calala, Hamtic, Antique.
10/07/2023

JOINT INSPECTION
Location: Calala, Hamtic, Antique.

CONCSTRUCTION OF FARM TO MARKET ROAD INSPECTIONLocation: Pamandayan, Hamtic, Antique
04/07/2023

CONCSTRUCTION OF FARM TO MARKET ROAD INSPECTION

Location: Pamandayan, Hamtic, Antique

01/07/2023

✅ CHECKLIST OF REQUIREMENTS FOR BUILDING PERMIT:

1. Proof of Lot Ownership (3 Copies) - TRANSFER CERTIFICATE OF TITLE/DEED OF SALE/LEASE OF CONTRACT/TAX DECLARATION.
2. Current TAX Receipts. (3 Copies)
3. Plans and Drawings. (6 Sets) - Duly Signed and Sealed by:
* Architect
* Civil Engineer
* Electrical Engineer
* Master Plumber
* Sanitary Engineer
4. Application Form (5 Copies) - Duly Signed and Sealed:
* Building Permit Forms
* Electrical Permit Forms
* Mechanical Permit Forms
* Fencing Permit Forms
5. Bill of Materials/Estimates (6 Copies) - Duly Signed and Sealed.
6. Specifications (6 Copies) - Duly Signed and Sealed.
7. Structural Analysis (For 2-Stories Up).
8. Barangay Clearance.
9. Road Right of Way from DPWH - San Jose, Antique, if along the National Road.
10. Duly Filled Up, Signed and Sealed Application Forms:
* Building
* Sanitary
* Plumbing
* Electrical
11. Zoning Clearance
12. Construction Safety and Health Certificate from DOLE.
13. Photocopy of Signing Engineer’s ID (3 Copies) - With Sign and Seal, PTR.

29/06/2023

📝REQUIREMENTS FOR CERTIFICATE OF OCCUPANCY:

1. Application for Certificate of Occupancy. (5 Copies)
2. Certificate of Completion of Building. (NOTARIZED - 5 Copies)
3. Certificate of Final Electrical Inspection/Completion. (5 Copies)
4. Logbook Duly Signed and Sealed.
5. As Built-Plans. (3 Sets)
6. Picture of Building.
* Front
* Back
* Left Side
* Right Side

Address

Poblacion 3, Antique
Hamtic
5715

Website

Alerts

Be the first to know and let us send you an email when Municipal Engineer's Office - Hamtic posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share