Engineering LGU Guiguinto

Engineering LGU Guiguinto Office of The Municipal Engineer of Guiguinto Bulacan. PHONE NUMBER: (044) 919-8260 Loc. 317 / 201

Office of the Municipal Engineer / Office of the Building Official
(Guiguinto Bulacan)

πŸ’» ENGINEERS AT BUILDING OWNERS! πŸ’»Nagpapa-install ba kayo ng CCTV, Fire Alarm, o IT Systems?KAILANGAN NIYO NG ELECTRONICS...
23/08/2026

πŸ’» ENGINEERS AT BUILDING OWNERS! πŸ’»

Nagpapa-install ba kayo ng CCTV, Fire Alarm, o IT Systems?

KAILANGAN NIYO NG ELECTRONICS PERMIT!

Ito ay para masiguro na:
βœ”οΈ Safe ang installation
βœ”οΈ Sumusunod sa batas
βœ”οΈ Protektado ang inyong building

Saklaw nito ang Electronics Plans, Elevator Controls, Security Systems, at marami pa!

Tumungo lang sa Office of the Local Building Official sa Guiguinto Municipal Hall para sa requirements.
πŸ“ž (044) 919-8260 local 317 / 201

Tulungan nating maging ligtas ang bawat gusali sa Guiguinto! πŸ’š

πŸ“’ PAALALA MGA GUIGUINTEΓ‘O! ⚑Magpapakabit ng bagong ilaw o saksakan? Maglalagay ng bagong metro, Transformer, o Panel Boa...
21/08/2026

πŸ“’ PAALALA MGA GUIGUINTEΓ‘O! ⚑

Magpapakabit ng bagong ilaw o saksakan? Maglalagay ng bagong metro, Transformer, o Panel Board? Mag-i-install ng Generator o malalaking Makina? πŸ’‘πŸ”Œ

TEKA MUNA! βœ‹

KAILANGAN MUNA NG ELECTRICAL PERMIT! πŸ“œ

Bakit nga ba mahalaga ito? πŸ€”
βœ… Para LIGTAS – Iwas-sunog at iwas-kuryente para sa pamilya at negosyo!
βœ… Para LEGAL – Tinitiyak na naaayon sa Philippine Electrical Code ang mga kable at gamit.
βœ… Para WALANG PROBLEMA

Saan kukunin? 🏒
πŸ“ Office of the Municipal Building Official (OMBO)
Guiguinto Municipal Hall

May mga katanungan? πŸ“ž
☎️ Landline: (044) 919-8260 local 317 / 201
πŸ“˜ Facebook: facebook.com/engineering.guiguinto

Madali lang mag-process basta kumpleto at tama ang mga dokumento! πŸ‘
I-share para malaman din ng iba! πŸ“²

21/08/2026
πŸ“’ PAALALA MGA GUIGUINTEΓ‘OπŸ“’Magpapakabit ng AIRCON? GENERATOR? ELEVATOR?ESCALATOR, MAKINA (PRESSURE BOILER) AT IBA PA.TEKA...
21/08/2026

πŸ“’ PAALALA MGA GUIGUINTEΓ‘OπŸ“’

Magpapakabit ng AIRCON? GENERATOR? ELEVATOR?ESCALATOR, MAKINA (PRESSURE BOILER) AT IBA PA.
TEKA MUNA! βœ‹

KAILANGAN MUNA NG MECHANICAL PERMIT βš™οΈ

Bakit?
Para LIGTAS βœ…
Para LEGAL βœ…
Para WALANG PROBLEMA sa permit βœ…

Saan kukunin?
πŸ“ Office of the Municipal Building Official
Guiguinto Municipal Hall lang po πŸ’š

May tanong?
πŸ“ž (044)919-8260 local 317 / 201
πŸ“˜ facebook.com/engineering.guiguinto

Madali lang mag-process basta kumpleto!
I-share para malaman ng iba πŸ‘‡

20/08/2026

πŸ“’ ATTENTION, GUIGUINTEΓ‘OS! WAG KALIMUTAN ANG PERMIT! πŸ“’

Magpapagawa ka ba ng bahay, bakod, o business signage?

Bago magsimula, kumuha muna ng PERMIT sa Office of the Local Building Official!

Andito na sa post na ito ang KUMPLETONG LISTAHAN ng requirements - 7 posters, 7 permits!

1️⃣ Building Permit
2️⃣ Occupancy Permit
3️⃣ Electrical / CFEI
4️⃣ Fencing
5️⃣ Mechanical
6️⃣ Demolition
7️⃣ Sign/Billboard

I-save mo na! Para pag punta mo sa munisipyo, kumpleto ka na. Hindi ka na pababalik-balikin!
Visit lang kami sa munisipyo.
Legal ang gawa, panatag ang buhay!

DOWNLOAD MO NA ANG MGA FORMS DITO SA LINK NA TO!!
https://www.facebook.com/engineering.guiguinto/posts/pfbid02eM2AA2rV1ZNo66opQz2jDAiHnydyLps9GkxDQWFweRizN4aRELwna6PHaugxnkLfl

20/08/2026
πŸ“’ ATTENTION, GUIGUINTENOS! WAG KALIMUTAN ANG PERMIT! πŸ“’Magpapagawa ka ba ng bahay, bakod, o business signage?Bago magsimu...
20/08/2026

πŸ“’ ATTENTION, GUIGUINTENOS! WAG KALIMUTAN ANG PERMIT! πŸ“’

Magpapagawa ka ba ng bahay, bakod, o business signage?

Bago magsimula, kumuha muna ng PERMIT sa Office of the Local Building Official!

Andito na sa post na ito ang KUMPLETONG LISTAHAN ng requirements - 7 posters, 7 permits!

1️⃣ Building Permit
2️⃣ Occupancy Permit
3️⃣ Electrical / CFEI
4️⃣ Fencing
5️⃣ Mechanical
6️⃣ Demolition
7️⃣ Sign/Billboard

I-save mo na! Para pag punta mo sa munisipyo, kumpleto ka na. Hindi ka na pababalik-balikin!

Visit lang kami sa munisipyo.

Legal ang gawa, panatag ang buhay!

ito ang link para sa forms
https://www.facebook.com/engineering.guiguinto/posts/pfbid02eM2AA2rV1ZNo66opQz2jDAiHnydyLps9GkxDQWFweRizN4aRELwna6PHaugxnkLfl

19/08/2026

ALTERNATIVE WORK ARRANGEMENTS FOR GOVERNMENT OFFICES, ALTERNATIVE LEARNING MODES FOR SCHOOLS ON AUGUST 20

Pursuant to Memorandum Circular No. 131, government offices are directed to implement appropriate alternative work arrangements in the National Capital Region and the following provinces on August 20, 2026:

πŸ“ National Capital Region (NCR)
πŸ“ Abra
πŸ“ Benguet
πŸ“ Ilocos Norte
πŸ“ Ilocos Sur
πŸ“ La Union
πŸ“ Pangasinan
πŸ“ Bataan
πŸ“ Bulacan
πŸ“ Nueva Ecija
πŸ“ Pampanga
πŸ“ Tarlac
πŸ“ Zambales
πŸ“ Batangas
πŸ“ Cavite
πŸ“ Laguna
πŸ“ Rizal
πŸ“ Occidental Mindoro

Unless otherwise directed by their respective Local Chief Executives, alternative learning modes for classes and learning continuity measures at all levels in public and private schools shall be implemented in the aforementioned areas.

Agencies involved in the delivery of basic and health services, disaster preparedness and response, and other vital services shall continue their operations and render the necessary services.

Contract of Service (COS) and Job Order (JO) workers placed under alternative work arrangements shall be paid their corresponding wages or salaries, subject to applicable rules and regulations.

The suspension of work or adoption of alternative work arrangements in the private sector shall be left to the discretion of management.

18/08/2026

ALTERNATIVE WORK ARRANGEMENTS FOR GOVERNMENT OFFICES, ALTERNATIVE LEARNING MODES FOR SCHOOLS ON AUGUST 19

Pursuant to Memorandum Circular No. 129, government offices are directed to implement appropriate alternative work arrangements in the National Capital Region and the following provinces on August 19, 2026:

πŸ“ National Capital Region (NCR)
πŸ“ Abra
πŸ“ Benguet
πŸ“ Ilocos Sur
πŸ“ La Union
πŸ“ Pangasinan
πŸ“ Bataan
πŸ“ Bulacan
πŸ“ Nueva Ecija
πŸ“ Pampanga
πŸ“ Tarlac
πŸ“ Zambales
πŸ“ Batangas
πŸ“ Cavite
πŸ“ Laguna
πŸ“ Rizal
πŸ“ Occidental Mindoro
πŸ“ Oriental Mindoro

Unless otherwise directed by their respective Local Chief Executives, alternative learning modes for classes and learning continuity measures at all levels in public and private schools shall be implemented in the aforementioned areas.

Agencies involved in the delivery of basic and health services, disaster preparedness and response, and other vital services shall continue their operations and render the necessary services.

The suspension of work or adoption of alternative work arrangements in the private sector shall be left to the discretion of management.

17/08/2026

πŸ“’ PABATID SA PUBLIKO | AGOSTO 18, 2026

Alinsunod sa Presidential Memorandum Circular No. 128, ipatutupad sa August 18, 2026 ang mga sumusunod:

πŸ›οΈ Para sa Government Offices:
Ipatutupad ang Alternative Work Arrangements (AWA).

🏫 Para sa Public at Private Schools:
Ipatutupad ang Alternative Learning Modalities.

Patuloy namang mag-ooperate ang mga tanggapan at ahensyang nagbibigay ng basic, health, disaster response, at iba pang vital services upang matiyak ang tuloy-tuloy na serbisyo publiko.

πŸ“ž EMERGENCY HOTLINE: 911

Para sa iba pang updates, manatiling nakatutok sa mga opisyal na social media channels ng Pamahalaang Bayan ng Guiguinto.

Address

2nd Floor, Municipal Hall, Poblacion
Guiguinto
3015

Opening Hours

Monday 7am - 6pm
Tuesday 7am - 6pm
Wednesday 7am - 6pm
Thursday 7am - 6pm

Telephone

+63449198260

Website

Alerts

Be the first to know and let us send you an email when Engineering LGU Guiguinto posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Engineering LGU Guiguinto:

Shortcuts

Share