Banisilan Waterworks System

Banisilan Waterworks System BWS Contact No. (0956) 270 4068

Recovery of the transmission pipeline for rerouting
05/09/2026

Recovery of the transmission pipeline for rerouting


REPAIR COMPLETED: 2 inches UPVC pipe to Purok Dulangan and New Paradise at Barangay Poblacion 1
04/09/2026

REPAIR COMPLETED: 2 inches UPVC pipe to Purok Dulangan and New Paradise at Barangay Poblacion 1


REPAIR COMPLETED: Cluster saddle clamp gasket at Barangay Poblacion 2
04/09/2026

REPAIR COMPLETED: Cluster saddle clamp gasket at Barangay Poblacion 2


REPAIR COMPLETED: 2 inches UPVC distribution line to Barangay Miguel
04/09/2026

REPAIR COMPLETED: 2 inches UPVC distribution line to Barangay Miguel


REPAIR COMPLETED: Cluster saddle clamp gasket at Sitio Lanag Barangay Miguel
04/09/2026

REPAIR COMPLETED: Cluster saddle clamp gasket at Sitio Lanag Barangay Miguel


Conducting a coordinative meeting with Dole Philippines land preparation Personels and Ma. Celina Trucking service Manag...
04/09/2026

Conducting a coordinative meeting with Dole Philippines land preparation Personels and Ma. Celina Trucking service Manager to discuss the proper and safe approach for rerouting two transmission pipelines that will be relocated through conventional methods. The team is working together to identify the most feasible solution while ensuring safety, structural integrity, and uninterrupted operation throughout the process.


REPAIR COMPLETED: cluster line at Barangay Malinao and 2 inches P.E distribution line at Barangay Miguel.
03/09/2026

REPAIR COMPLETED: cluster line at Barangay Malinao and 2 inches P.E distribution line at Barangay Miguel.


REPAIR COMPLETED: 2 inches UPVC distribution line at Barangay Miguel
02/09/2026

REPAIR COMPLETED: 2 inches UPVC distribution line at Barangay Miguel


REPAIR COMPLETED: 2 inches UPVC distribution line at Purok Mapayapa, Poblacion 1.
02/09/2026

REPAIR COMPLETED: 2 inches UPVC distribution line at Purok Mapayapa, Poblacion 1.


REPAIR COMPLETED: 2 inches UPVC pipe at Purok Mapayapa, Poblacion 1
02/09/2026

REPAIR COMPLETED:
2 inches UPVC pipe at Purok Mapayapa, Poblacion 1


Address

Municipal Ground, Poblacion 1, Banisilan Cotabato
Banisilan
9416

Website

Alerts

Be the first to know and let us send you an email when Banisilan Waterworks System posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Shortcuts

Share