Narayani Lift , Khageri Irrigation Management Division Chitwan , Bharatpur.

  • Home
  • Nepal
  • Bharatpur
  • Narayani Lift , Khageri Irrigation Management Division Chitwan , Bharatpur.

Narayani Lift , Khageri Irrigation Management Division Chitwan , Bharatpur. Narayani Lift Irrigation System (NLIS) is one of the big lift irrigation systems of Nepal, which provides irrigation to the upper terraces of Narayani Rive

Narayani Lift Irrigation System (NLIS) is one of the big lift irrigation systems of Nepal, which provides irrigation to the upper terraces of Narayani River in the vicinity of Bharatpur municipality. The system falls on Bharatpur Municipality and other 5 VDCs namely Phulbari, Shivanagar, Mangalpur, Sardanagar and Gitanagar. The system was initially constructed in 1982 in the name of Chitawan Valle

y Development Project (CVDP) by the Department of Irrigation, which included three irrigation schemes Panchakanya, Lothar and Narayani Lift. The Narayani Lift Irrigation Project (NLIP) was studied and designed by a German Consulting Firm “Agra and Hydro Technique GMBH” in 1972 to pump water from Narayani river and to irrigate 4,700 ha of land. The project was also envisaged to supplement Khageri Irrigation System having command area of 3,900 ha. The project was commissioned in 1982 and was operational since in the name of Narayani Lift Irrigation System (NLIS). The NLIS has two staged pump and two canal systems: canal-B and canal-C. The pump-A lifts water from the river to 20 m high link canal and has the capacity to pump up to 17 m3/s while pump-B lifts water from the link canal to 18 m to canal-C and has the capacity to pump up to 7.2 m3/s. In the current state of irrigation practice costing Nrs. 4,985.04 just for 3 months of water supply during monsoon.

With Jica team at Head work of  khageri irrigation system.
25/09/2019

With Jica team at Head work of khageri irrigation system.

03/09/2018
Some glimpses of wheat planting by Power tiller mounted seed driller under ICWM Program at BL2 , Langku .
27/11/2017

Some glimpses of wheat planting by Power tiller mounted seed driller under ICWM Program at BL2 , Langku .

Official Team Visited to the site for the inspection of damaged structure of Khageri Irrigation system, Bharatpur, Chitw...
22/08/2017

Official Team Visited to the site for the inspection of damaged structure of Khageri Irrigation system, Bharatpur, Chitwan.

23/07/2017

@ Link Canal of Narayani Lift Irrigation System .

पम्प चलाउनको लागि तयारी गर्दाको क्षण ।
13/07/2017

पम्प चलाउनको लागि तयारी गर्दाको क्षण ।

Some glimpses of Canal reshaping works in  Naraayani Lift Irrigation System, Chitwan.
11/03/2017

Some glimpses of Canal reshaping works in Naraayani Lift Irrigation System, Chitwan.

Some clicks @ Canal Operation Periods of Narayani Lift Irrigation System.
29/10/2016

Some clicks @ Canal Operation Periods of Narayani Lift Irrigation System.

After Reshaping the Canal of Narayani Lift as well as Khageri Main Canal , It looks .
28/03/2016

After Reshaping the Canal of Narayani Lift as well as Khageri Main Canal , It looks .

18th General Assembly Of WUAs Of Narayani Lift Irrigation System , Chitwan.
21/03/2016

18th General Assembly Of WUAs Of Narayani Lift Irrigation System , Chitwan.

22/12/2015

Address

Bharatpur

Opening Hours

Monday 10:00 - 17:00
Tuesday 10:00 - 17:00
Wednesday 10:00 - 17:00
Thursday 10:00 - 17:00
Friday 10:00 - 17:00
Sunday 10:00 - 17:00

Telephone

+97756533404

Website

Alerts

Be the first to know and let us send you an email when Narayani Lift , Khageri Irrigation Management Division Chitwan , Bharatpur. posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Narayani Lift , Khageri Irrigation Management Division Chitwan , Bharatpur.:

Share