24/11/2025
Update on Swing Area Repairs at Mitton
We’re aware the surface under the swings needs attention and our contractor had hoped to complete the work this week. Unfortunately, the recent mix of wet weather, extreme heat over the summer, and now colder conditions has delayed installation.
To ensure a safe, high-quality finish, the rubber surfacing must be laid in dry conditions above 5°C. If installed in rain or extreme temperatures, the surface could crack or shrink, which we want to avoid.
Thank you for your patience, we’ll keep you posted as soon as conditions allow us to proceed and in the meantime, please take extra care in this area.