10/06/2026
Good Evening all and welcome to another mid week update.
The S&T boys were busy today getting cable runs installed for the crossing system, the first job was to drill the gate beam and then tap out the holes, next was a bit of digging and checking out a groove in the sleeper for the cables to route along back to the location cabinet, once all of that was done we routed the cables via plastic conduit to help protect them and got to back filling the trenches. the cables are now fed into the box and ready to be connected up, more to follow on this tomorrow.
The wooden tops were busy as always getting more fire wood processed and then moving onto sorting out the table top that Jan donated, there is some additions to this so keep an eye out for more updates on it but it is going to look amazing.
Iain was busy in the traggon getting more linseed oil on the pews and the window frames to give them the depth that the wood deserves and leaves them looking fantastic.
The plinth for the tram controler was givin its first coat of gloss black and should see more paint on Sunday now we are in the warmer months. but once it is done and in place we think it will be another great item which should be a talking point for visitors.
The workshop team were busy creating more space and continued their cleanup, a box full of metal offcuts that has been sat for 30 years was finaly disposed of so you can bet we will need a bit for a bracket next week lol.
And thats all for now folks, see you all Sunday for the next instalment.
Cheers, The Shed 47 Team.