12/05/2026
A good bit of progress this week. As soon as the corner was dry enough to hold the roof, we could reveal the damage of the front wall - which is split vertically nearest the corner, and has a previously bodged diagonal fracture - which is to be rebuilt. All vertical blocks are secured by long fixings into the original, and all vertical cracks have been cross-stitched using 'spiro-ties'.