Renee Kirchoff - JWC Pct. 3 Commissioner

Renee Kirchoff  - JWC Pct. 3 Commissioner You MUST call the office for any questions, comments or concerns. 361-384-2747

I’ve received several concerns about how road work is being allocated within my precinct.Below are four charts that prov...
10/26/2025

I’ve received several concerns about how road work is being allocated within my precinct.

Below are four charts that provide a detailed overview:
1. Total Road Distribution – Percentage of total road miles in each area (187 miles total)
2. Paved and Caliche Construction – Major road projects completed (both paved and caliche combined)
3. Caliche Road Construction – Major projects on caliche roads
4. Paved Road Construction – Major projects on paved roads

Note: These charts reflect major construction only and do not include patching or minor maintenance.

When comparing the Total Road Distribution with the Paved and Caliche Construction charts, you’ll see that work has been distributed proportionally across all areas.

Thank you for your continued interest in our infrastructure progress. Transparency and balanced improvement remain top priorities for our precinct.

10/20/2025

Edging on CR 357 before and after.

Sometimes the width of the road is deceiving without a center stripe, but remaining on the pavement will improve the longevity of the edges (for completed or wider roads).

10/16/2025

What a difference in 3053

10/06/2025

Before and after of 3522!

10/01/2025

Check out the before and after of CR 348!

For concerns or questions the office number is 361-384-2747

09/23/2025

Check out 3031’s transformation

Long time no post, and what a time it’s been. Below you will find a list and map of all the roads we have worked on and ...
09/21/2025

Long time no post, and what a time it’s been.
Below you will find a list and map of all the roads we have worked on and the corresponding categories.

1. Total Redo: rip, rebuild with a double chip seal

2. Preventative: single coat chip seal

3. Edges Redo: rip, rebuild with double chip seal

4. In line for chip seal: ripped and rebuild, waiting for double chip seal

Before and after pictures that have not been shared already will be posted on a weekly basis.
We will then share the next batch of progress.

Precinct 3 has 147 county roads — while I wish I can do them all at once, we can only do one road at a time.

Thank you for all of your patience as virtually ALL of my roads need to be redone, however, we will be coming to a road near you!

For questions or concerns, you must contact us at the office, 361-384-2747.
If you call outside office hours, please leave a message and we will get back to you.

09/04/2025

Budget hearings are underway in JWC.
One proposal includes a salary increase for all county employees:
a 5% increase -- adding $600,000 to the budget
or a 3% increase -- adding $399,000.

View the current salary schedule here: https://drive.google.com/file/d/1HCZmbbVxVt1zaa4RLIgIMqCyhIWKwsdP/view?usp=sharing

Note: This specific proposal does not affect funding for road & bridge, sheriff’s jail fund, or other specific budgets.

Taxpayers, your voice matters! Share your input at Commissioner’s Court:

Budget Hearing: September 5th, 9:00 AM, public testimony first on the agenda.
Budget Adoption: September 26th, 9:00 AM, also open to public testimony.

Join us at the JWC Courthouse to participate.

06/19/2025

🚜 NOW HIRING – CDL DRIVER 🚜
Starting Pay: $14/hour

Requirements:
• Valid CDL (Commercial Driver’s License)
• Ability to operate and maintain equipment
• Reliable personal transportation
• Working cell phone
• Ability to lift 50+ lbs
• Willingness to work outdoors in 100+ degree weather
• Strong work ethic and punctuality

Preferred Qualities:
• Experience with road or construction work
• Mechanically inclined
• Self-starter with problem-solving skills
• Willing to assist with labor tasks when not driving

Pick up an application at the office on 107 Armstrong drive
361-384-2747

06/18/2025

🚧 NOW HIRING – PART-TIME ROAD WORKER🚧
We’re looking for reliable, hard-working individuals to join our Precinct 3 Road Crew.
If you can handle physical labor, problem-solve on the spot, and show up ready to work—even in the Texas heat—we want to hear from you.

Job Requirements:
• Valid Driver’s License
• Personal Vehicle
• Working Cell Phone
• Ability to lift 50+ lbs
• Ability to work outdoors in 100+ degree heat
• Must be dependable and take initiative

Preferred Qualities:
• Strong problem-solving skills
• Self-motivated, go-getter attitude
• Prior experience with manual labor or road work and equipment is a plus

Collect an application at the office on 107 Armstrong Dr.
361-384-2747

03/12/2025

Hello everyone, I wanted to inform you that the additional trash services previously provided by the PCT 1 Commissioner have been cancelled. This was not a required service but an extra offering at an additional cost.

If this affects you, please consider reaching out to local garbage pickup companies or utilizing the Alice landfill for disposal.

02/22/2025

The county trash is open today until 1 PM

Address

107 Armstrong Drive
Orange Grove, TX
78372

Alerts

Be the first to know and let us send you an email when Renee Kirchoff - JWC Pct. 3 Commissioner posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Contact The Organization

Send a message to Renee Kirchoff - JWC Pct. 3 Commissioner:

Share