03/07/2025
About 2/3 of the way through the piping on this massive project (biggest in 42 years). Lots of work above and beyond the piping to complete. It’s all in the details.
For those who know… 2000gpm fire pump, 8 Wet Systems, 3 Dry Systems, 120 foot “tower” for material mixing processes with Standpipes; three smaller 3-story flex mixing plants within 68 foot high portion of production area.