Padma Multipurpose Bridge-পদ্মা বহুমুখী সেতু

Padma Multipurpose Bridge-পদ্মা বহুমুখী সেতু The Padma Bridge is a multipurpose road-rail bridge across the Padma River to be constructed in Bangladesh.

When completed it will be the largest bridge in Bangladesh and the first fixed river crossing for road traffic. It will connect Louhajong, Munshiganj to Shariatpur and Madaripur, linking the south-west of the country, to northern and eastern regions. The project covers three districts — Munshiganj (Mawa Point/North bank), Shariatpur and Madaripur (Janjira/South bank). The total area of land to be

acquired and required for its components is 918 hectares. The requisition of land for the construction yard will be for six years on a rental basis. As per the new design, an additional 144.04 ha has been identified for acquisition, bringing the total to 1062.14 hectares. This additional land is required because project site lost significant land due to erosion, for transition structures and due to a change in railway alignment. The two-level steel truss bridge will carry a four-lane highway on the upper level and a single track railway on a lower level. The project will include 6.15 km long[1] and 18.10 m wide bridge, 15.1 km of approach roads, toll plazas and service areas.

Address

Munshiganj

Website

Alerts

Be the first to know and let us send you an email when Padma Multipurpose Bridge-পদ্মা বহুমুখী সেতু posts news and promotions. Your email address will not be used for any other purpose, and you can unsubscribe at any time.

Share